Experience
Dansco Utilities are in a unique position, having the skills, experience and knowledge to carry out work on low, medium, intermediate and high pressure pipelines. We are well equipped to help you with any current or future projects.
Our Technicians have had extensive training and live on site experience on the equipment listed below:
Under Pressure Drilling - Mueller C1-36, Mueller Mega Lite, Peart 450, Peart 150, TDW 101, 360, 660, 760 & 1200, Fusion Fastcut, PQR 6000
PE Connections and Flowstopping - Fusion, GPS, Friatec, TDW Short Stop II, and the SOU180, SOU250, SOU400, SOU500 Squeeze off equipment
Flowstopping - TDW Stopple, TDW Short Stop 60, TDW Short Stop II, Mueller Line-Stopper, ALH Iris Stop, ALH System 3 Large Diameter Bagtube, Wask bag stop equipment
CCTV Pipeline Survey - Synthotec SynthoTrax, Pearpoint P420
Cold Cutting - Keel N450 (including window cutting frame), Keel N600, Wachs Trav-L-Cutter, Wachs MDSF, Kent Precision Window Cutter
THE JOURNEY SO FAR
Dansco Utilities have successfully completed a number of large projects to date all over the UK that has helped with the growth of our customer base. Since starting in August 2018 we have tested and commissioned over 20 kilometres of new pipeline, surveyed over 100kms of pipeline, carried out over 100 under pressure drillings as well as various other cold cutting and flow stopping operations.